Key Issues
· The 2023-24 Budget provides total infrastructure funding of almost $5 billion over the Budget and Forward Estimates period, demonstrating the Government’s ongoing commitment to investing in the infrastructure needed to support service delivery and increase the productive capacity of the Tasmanian economy.
· Infrastructure investment in the General Government Sector is almost $4.3 billion over the 2023‑24 Budget and Forward Estimates. This investment includes funding for roads and bridges ($2.2 billion); tourism, recreation and culture ($557.3 million); hospitals and health ($502.9 million); law and order ($375 million); ICT to support service delivery ($311.7 million); schools, education and skills ($305.1 million); and other infrastructure ($26.5 million).
· The 2023-24 Budget and Forward Estimates include additional funding of $441.8 million for the delivery of new infrastructure projects by the General Government Sector.
· State funding of $230 million is allocated over the 2023‑24 Budget and Forward Estimates towards the Macquarie Point Urban Renewal project. With a total State funding commitment of $375 million, the project will deliver a new multipurpose arts, entertainment and sporting precinct at Macquarie Point in Hobart.
· The 2023-24 Budget also allocates $60 million towards the Tasmanian AFL Package - High Performance Centre. This initiative will deliver a new High Performance Training and Administrative Centre to accommodate and support the new Tasmanian AFL and AFLW teams.
· The 2023‑24 Budget continues funding for the delivery of the $786 million New Bridgewater Bridge, which is currently under construction. This project is the biggest transport infrastructure project in Tasmania’s history and will improve safety, reduce travel times and support local jobs.
· In addition to the significant investment in the General Government Sector, the 2023-24 Budget supports investment by government businesses and other entities, with $656.5 million in equity funding for infrastructure investment. This funding includes equity contributions of: $291.1 million to Tasmanian Irrigation Pty Ltd; $197.4 million for Tasmanian Railway Pty Ltd; and $65 million for Stadiums Tasmania, reflecting the Tasmanian Government’s contribution towards the redevelopment of the UTAS Stadium in Launceston.
· The 2023‑24 Budget and Forward Estimates also includes funding of $68.8 million for Homes Tasmania, which will be provided as a grant through the Department of Premier and Cabinet, to support delivery of the 10‑year, $1.5 billion plan to provide 10 000 new social and affordable homes by 2032.
Over the 2023-24 Budget and Forward Estimates, investment of almost $4.3 billion for community infrastructure projects will be delivered by Government agencies, including:
· roads and bridges ($2.2 billion);
· tourism, recreation and culture ($557.3 million);
· hospitals and health ($502.9 million);
· law and order ($375 million);
· ICT to support service delivery ($311.7 million);
· schools, education and skills ($305.1 million); and
· other infrastructure ($26.5 million).
In addition, the 2023-24 Budget and Forward Estimates includes infrastructure investment outside of the General Government Sector through government businesses and other entities, supported by Government equity contributions of $656.5 million.
A number of the infrastructure projects extend beyond the current Forward Estimates period including: Launceston General Hospital - Stage 2 (including Mental Health Precinct); North West Regional Hospital Upgrade; New Northern Correctional Facility; Next Iconic Walk; South East Traffic Solution; Launceston and Tamar Valley Traffic Vision; State Road Upgrades - Southern Region; Roads of Strategic Importance; Urban Congestion Fund; East and West Tamar Highway Upgrades; Sideling Upgrades Stage 2; Arthur Highway Upgrades; Algona Interchange and Kingston Bypass; Rokeby Stage 3 - Pass Road to Oakdowns; Stanley Highway Tourism Upgrades; Devonport to Cradle Mountain Road Upgrades; Cycling Infrastructure; Infrastructure Stimulus Funding; Great Eastern Drive and Macquarie Point Urban Renewal.
The Government continues to provide Tasmanian businesses with certainty of long‑term growth in public infrastructure investment, enabling businesses to plan and invest with confidence. Further information regarding the Government’s long‑term infrastructure investment plans is available in the 10 Year Infrastructure Pipeline - Online Database.
Homes Tasmania was established on 1 December 2022 under the Homes Tasmania Act 2022. The new entity is responsible for the delivery of housing infrastructure projects previously reflected in the former Department of Communities Tasmania. Homes Tasmania has been classified as a Public Non-Financial Corporations Sector entity. As a result, its infrastructure spending is not included in the General Government Sector Infrastructure Investment Program. Funding of $68.7 million is provided in the 2023‑24 Budget and Forward Estimates to support Homes Tasmania’s infrastructure spending through the Department of Premier and Cabinet as a grant. The grant funding supports borrowing costs associated with Homes Tasmania’s planned capital program expenditure. Information on Homes Tasmania can be found in chapter 28 of Government Services Budget Paper No 2.
Chart 6.1 details agency infrastructure investment from 2017-18 to 2022-23 and budgeted infrastructure investment over the 2023-24 Budget and Forward Estimates.

Note:
1. The
Actual Infrastructure Investment and 2022-23 Estimated Outcome data presented
above includes infrastructure investment undertaken by the former Department of
Communities Tasmania. Following the formation of Homes Tasmania on 1 December 2022
(as a Public Non-Financial Corporations Sector entity), Housing infrastructure
investment will not be recognised in the General Government Sector.
Notes:
1. This Table includes expenditure (both Purchases of Non-Financial Assets and associated expenses) for all infrastructure projects but does not include minor asset purchases for non-infrastructure projects. For these reasons, the Table is not equivalent to the Purchases of Non-Financial Assets presented in chapter 4 of this Budget Paper. Table 6.5 provides a reconciliation of Purchases of Non‑Financial Assets to Infrastructure Investment.
2. Estimated Outcome expenditure for some agencies, when compared with the 2022-23 Budget, may reflect increased expenditure for some projects, partially offset by a change in expenditure from 2022-23 to the 2023-24 Budget and over the Forward Estimates.
3. Communities Tasmania was responsible for the delivery of housing infrastructure projects until its cessation on 30 November 2022. Homes Tasmania commenced on 1 December 2022 and is now responsible for the delivery of these projects.
4. The 2022-23 Budget has been restructured during 2022-23. As such, the information relating to the 2022-23 Budget reflects the impact of the reallocation of the Youth Justice Facilities project from the former Department of Communities Tasmania to the Department for Education, Children and Young People.
Infrastructure investment undertaken by Government Business Enterprises or State-owned Companies is outside of the General Government Sector and is, therefore, not included as infrastructure investment for the purpose of this chapter. Other associated entities such as the Macquarie Point Development Corporation, Stadiums Tasmania and the Tasmanian Water and Sewerage Corporation Pty Ltd also operate outside of the General Government Sector. Information on infrastructure investment undertaken by these entities can be found in entity annual reports or on relevant websites.
The 2023-24 Budget includes equity contributions that are provided through the General Government Sector to directly support a number of these entities to undertake infrastructure projects. These equity contributions are detailed in Table 6.2.
All equity contributions to these entities are made through Finance-General.
Over the 2023-24 Budget and Forward Estimates, the total equity funding allocated to infrastructure investment is $656.5 million. When combined with the General Government Sector agency infrastructure funding, this takes the total investment by the Tasmanian and Australian Governments in infrastructure over this period to almost $5 billion. This does not include the funding provided to Homes Tasmania to deliver its planned infrastructure investment as this funding is paid as a grant.
Homes Tasmania delivers housing related infrastructure investment outside of the General Government Sector. Grant funding to support Homes Tasmania’s infrastructure spending is provided through the Department of Premier and Cabinet. The grant meets borrowing costs associated with Homes Tasmania’s planned infrastructure program. Information on capital priorities for Homes Tasmania can be found in chapter 28 of Government Services Budget Paper No 2.
Note:
1. Funding of $20 000 is provided to Metro Tasmania Pty Ltd in 2025-26, however, it does not appear in the table due to rounding.
The Australian Government has committed funding of $42.2 million over the 2023-24 Budget and Forward Estimates for the redevelopment of the Tarraleah Power Station.
The 2023-24 Budget and Forward Estimates include equity contributions of $3.3 million for Metro to undertake an electric bus trial.
The 2023-24 Budget and Forward Estimates include equity contributions of $100.1 million for the continuation of the State’s equity contributions to Tasmanian Irrigation to support Tranche 3 irrigation projects, Energy on Farms initiatives and the Lake Leake Dam Life Extension Project. The Australian Government has committed $190.9 million over the 2023-24 Budget and Forward Estimates to support Tranche 3 irrigation projects and the Lake Leake Dam Life Extension Project.
The 2023-24 Budget and Forward Estimates include $197.4 million in equity contributions from the State and Australian Governments to TasRail. The equity contributions include $136 million for Tranche 3 and 4 of the Tasmanian Freight Rail Revitalisation Program, $30 million for the reconnection of the Bell Bay rail line to the Port of Bell Bay, $18 million for the construction of a new minerals hub on the Melba rail line and $9 million for the overhaul of TasRail’s legacy locomotives. The 2023-24 Budget also includes funding of $4.4 million for road rail vehicles.
The 2023-24 Budget provides equity funding of $7.5 million for Tasracing Pty Ltd. Funding of $6.5 million has been provided for racing infrastructure in the North West of the State and a further $1 million for other capital projects.
The replacement of TT-Line’s passenger ferries represents a significant long-term investment by the State. TT-Line has entered into a contract with Finnish shipbuilder Rauma Marine Constructions for the delivery of two steel monohull passenger vessels. The contract provides for the delivery of vessel one in early 2024 and vessel two in late 2024. The cost of the purchase of the vessels has been supported by the allocation of funding from the TT-Line Vessel Replacement Fund. The balance of the Fund was withdrawn in December 2022, in accordance with the contracted payment profile for the purchase of the new vessels.
Equity funding of $28.2 million has been provided to the Macquarie Point Development Corporation in 202223. This funding will support planned activity at the site, aligned to the broader strategic objectives of the Macquarie Point Urban Renewal project.
An equity contribution of $65 million will be provided to Stadiums Tasmania for the redevelopment of the UTAS Stadium in Launceston. This redevelopment will include a new Eastern Stand, improved playing facilities and a new entertainment precinct. The Australian Government has also recently committed $65 million towards the redevelopment, reflecting a total project commitment of $130 million.
In 2018-19, the Government committed funding of $300 million, over 10 years, to support TasWater’s accelerated infrastructure program (through a $200 million equity contribution) and to enable the decommissioning of TasWater’s Macquarie Point wastewater treatment plant ($100 million in grant funding). The balance of the equity funding ($50 million) will be contributed in 2023‑24.
Table 6.3 provides infrastructure investment project details for the General Government Sector by agency, including projects which are continuing from previous Budget years and new infrastructure projects that have been funded by the Government in the 2023-24 Budget.
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
Education, Children and Young People |
|
|
|
|
|
|
|
|
|
Bothwell District School - Agriculture in Schools |
Existing |
2021 |
2024 |
2.0 |
1.6 |
.... |
.... |
.... |
|
Cambridge Primary School - Major School Redevelopment |
Existing |
2021 |
2026 |
15.1 |
3.9 |
4.0 |
7.0 |
.... |
|
Campbell Town District School - Agriculture in Schools |
Existing |
2021 |
2025 |
2.0 |
1.5 |
0.4 |
.... |
.... |
|
Contemporary Classrooms |
Existing |
2021 |
2027 |
10.0 |
2.1 |
2.0 |
2.0 |
3.0 |
|
Eastern Shore Multi-Sports Facility3 |
Existing |
2021 |
2027 |
8.0 |
.... |
.... |
.... |
8.0 |
|
Electrical Switchboard Maintenance |
Existing |
2023 |
2026 |
8.0 |
3.5 |
2.0 |
2.0 |
.... |
|
Exeter High School - Major School Redevelopment |
Existing |
2021 |
2025 |
11.0 |
3.9 |
6.6 |
.... |
.... |
|
Glen Dhu Pool |
Existing |
2021 |
2025 |
3.5 |
1.7 |
1.7 |
.... |
.... |
|
Hobart City High School (Ogilvie and New Town Campuses) |
Existing |
2021 |
2027 |
21.6 |
1.0 |
4.7 |
7.0 |
7.0 |
|
Lauderdale Primary School - Major School Redevelopment |
Existing |
2021 |
2025 |
6.5 |
5.0 |
1.1 |
.... |
.... |
|
Legana Primary School4 |
Existing |
2020 |
2026 |
35.3 |
14.7 |
13.8 |
0.8 |
.... |
|
Montello Primary School - Major School Redevelopment |
Existing |
2021 |
2025 |
7.1 |
5.8 |
1.0 |
.... |
.... |
|
Mt Nelson School Oval |
Existing |
2021 |
2024 |
0.1 |
0.1 |
.... |
.... |
.... |
|
New Brighton High School4 |
Existing |
2020 |
2025 |
74.0 |
20.9 |
42.7 |
.... |
.... |
|
New K-12 Penguin School |
Existing |
2018 |
2024 |
20.0 |
0.4 |
.... |
.... |
.... |
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
CHHP Kings Meadows Community Centre6 |
Existing |
2021 |
2025 |
10.0 |
3.3 |
6.1 |
.... |
.... |
|
CHHP St Johns Park Eating Disorders Treatment Centre6 |
Existing |
2020 |
2025 |
10.0 |
3.3 |
6.1 |
.... |
.... |
|
Digital Health Transformation4,7 |
Existing |
2022 |
2027 |
210.0 |
40.0 |
40.0 |
40.0 |
60.0 |
|
Hospital Equipment Fund |
Existing |
2021 |
2024 |
20.0 |
4.0 |
.... |
.... |
.... |
|
Kingston Health Centre - Stage 2 |
Existing |
2023 |
2027 |
30.0 |
1.0 |
8.0 |
11.0 |
10.0 |
|
Launceston General Hospital Helipad |
New |
2023 |
2024 |
15.0 |
15.0 |
.... |
.... |
.... |
|
Launceston General Hospital Redevelopment - Stage 1 |
Existing |
2018 |
2026 |
87.3 |
1.7 |
15.0 |
15.0 |
.... |
|
Launceston General Hospital Redevelopment - Stage 2 (including Mental Health Precinct)8,9 |
Existing |
2021 |
2032 |
580.0 |
8.0 |
12.0 |
32.0 |
31.7 |
|
Maternity Services at the North West Regional Hospital |
Existing |
2018 |
2024 |
5.8 |
0.6 |
.... |
.... |
.... |
|
Mersey Community Hospital - Expanded Redevelopment |
Existing |
2022 |
2026 |
20.0 |
1.0 |
9.3 |
9.7 |
.... |
|
Mersey Community Hospital Capital Upgrades |
Existing |
2018 |
2024 |
37.4 |
14.3 |
.... |
.... |
.... |
|
Midlands Multipurpose Health Centre Upgrade |
Existing |
2021 |
2027 |
3.5 |
2.0 |
.... |
.... |
0.9 |
|
New Ambulance Vehicles and Equipment |
Existing |
2021 |
2024 |
9.0 |
4.0 |
.... |
.... |
.... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
North West Regional Hospital - Mental Health Precinct |
Existing |
2022 |
2026 |
40.0 |
3.0 |
16.8 |
20.1 |
.... |
|
North West Regional Hospital Upgrade8 |
Existing |
2022 |
2028 |
20.0 |
1.8 |
.... |
0.8 |
10.5 |
|
Regional Health and Ambulance Facilities Fund |
Existing |
2021 |
2024 |
10.0 |
6.8 |
.... |
.... |
.... |
|
Royal Hobart Hospital - New Angiography Suite and Equipment Upgrade |
Existing |
2023 |
2025 |
7.0 |
5.6 |
1.0 |
.... |
.... |
|
Royal Hobart Hospital Pharmacy Redevelopment4 |
Existing |
2019 |
2025 |
21.9 |
8.8 |
12.0 |
.... |
.... |
|
Royal Hobart Hospital Redevelopment |
Existing |
2011 |
2024 |
469.2 |
2.5 |
.... |
.... |
.... |
|
Royal Hobart Hospital Redevelopment - Expanded Stage 2 |
Existing |
2023 |
2027 |
110.0 |
13.2 |
52.5 |
36.9 |
7.4 |
|
Royal Hobart Hospital Stage 2 Redevelopment |
Existing |
2019 |
2024 |
91.1 |
30.5 |
.... |
.... |
.... |
|
Rural Hospital Equipment Boost |
Existing |
2021 |
2024 |
5.0 |
1.5 |
.... |
.... |
.... |
|
Statewide Hospital Critical Facility Upgrades |
Existing |
2018 |
2025 |
7.0 |
0.3 |
0.3 |
.... |
.... |
|
Statewide Rural Hospital and Ambulance Station Upgrade Fund4 |
Existing |
2018 |
2025 |
21.0 |
2.8 |
2.8 |
.... |
.... |
|
|
|
|
|
|
201.3 |
195.8 |
165.3 |
120.5 |
|
Justice |
|
|
|
|
|
|
|
|
|
Burnie Court Complex4 |
Existing |
2020 |
2027 |
86.5 |
10.1 |
14.4 |
20.4 |
37.3 |
|
Mobile Duress Alarm System Replacement10 |
Existing |
2023 |
2025 |
3.6 |
1.8 |
1.8 |
.... |
.... |
|
New Northern Correctional Facility8 |
Existing |
2019 |
2031 |
270.0 |
8.3 |
32.6 |
48.3 |
35.0 |
|
New Southern Remand Centre |
Existing |
2018 |
2025 |
85.0 |
14.8 |
2.2 |
.... |
.... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
Prison Body Scanning Technology |
Existing |
2022 |
2024 |
1.3 |
0.4 |
.... |
.... |
.... |
|
Risdon Prison - Critical Infrastructure Maintenance |
Existing |
2021 |
2025 |
9.0 |
3.5 |
2.5 |
.... |
.... |
|
Risdon Prison Complex - Additional Maximum Security Accommodation |
New |
2024 |
2027 |
50.0 |
1.3 |
7.1 |
26.5 |
15.1 |
|
|
|
|
|
|
40.2 |
60.7 |
95.3 |
87.4 |
|
Natural Resources and Environment Tasmania |
|
|
|
|
|
|
|
|
|
Arthur Pieman Conservation Area |
Existing |
2021 |
2026 |
10.0 |
1.0 |
4.0 |
3.0 |
.... |
|
Ben Lomond - A Year Round Destination |
Existing |
2022 |
2027 |
2.8 |
0.3 |
0.8 |
0.6 |
0.8 |
|
Biosecurity Risk Management and Truck and Machinery Washes |
Existing |
2018 |
2024 |
2.0 |
0.3 |
.... |
.... |
.... |
|
Bushfire Management Capacity |
New |
2024 |
2025 |
0.6 |
0.3 |
0.3 |
.... |
.... |
|
Cape Bruny Car Park and Access Upgrade4 |
Existing |
2023 |
2024 |
1.7 |
1.6 |
.... |
.... |
.... |
|
Cockle Creek Camping and Access Upgrade4 |
Existing |
2021 |
2026 |
3.3 |
1.7 |
1.1 |
0.3 |
.... |
|
Cradle Mountain Experience11 |
Existing |
2019 |
2026 |
61.0 |
12.2 |
11.0 |
34.9 |
.... |
|
Crown Land Services - Structural Asset Upgrades |
Existing |
|
Ongoing |
na |
0.6 |
0.6 |
0.6 |
0.6 |
|
Edge of the World Revitalisation |
Existing |
2024 |
2027 |
2.8 |
0.2 |
0.8 |
1.0 |
0.9 |
|
Fisheries Digital Transition Project (Stage 2)12 |
Existing |
2017 |
2024 |
6.2 |
0.3 |
.... |
.... |
.... |
|
Flinders Island Camping Upgrades and RV Access4 |
Existing |
2021 |
2026 |
1.1 |
0.2 |
0.5 |
0.4 |
.... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
Waste Action Implementation |
Existing |
2021 |
2024 |
1.0 |
0.4 |
.... |
.... |
.... |
|
|
|
|
|
|
41.9 |
50.1 |
64.9 |
14.5 |
|
Police, Fire and Emergency Management13 |
|
|
|
|
|
|
|
|
|
Automatic Vehicle Location Upgrade Project |
Existing |
2023 |
2026 |
6.2 |
4.6 |
0.8 |
0.8 |
.... |
|
Bridgewater Police Station Upgrade |
Existing |
2022 |
2026 |
12.5 |
3.0 |
6.9 |
2.0 |
.... |
|
Crackdown on Anti-Social Driving |
Existing |
2018 |
2026 |
0.9 |
0.1 |
0.1 |
0.1 |
.... |
|
Fire and Emergency Service Volunteer Grants Program14 |
Existing |
2023 |
2026 |
2.0 |
0.5 |
0.5 |
0.5 |
.... |
|
Forensic Science Technology Uplift |
Existing |
2023 |
2026 |
3.7 |
1.2 |
0.1 |
0.1 |
.... |
|
Large Vessel Replacement Program |
Existing |
2014 |
2024 |
24.6 |
6.5 |
.... |
.... |
.... |
|
Police Academy Capacity Upgrades |
New |
2024 |
2025 |
4.1 |
0.5 |
3.6 |
.... |
.... |
|
Project Unify |
Existing |
2020 |
2026 |
46.1 |
12.9 |
9.1 |
9.1 |
.... |
|
Rosebery Police Station |
Existing |
2023 |
2024 |
1.0 |
0.7 |
.... |
.... |
.... |
|
St Helens Police Station |
Existing |
2022 |
2026 |
7.5 |
0.2 |
2.4 |
4.2 |
.... |
|
Upgrade Police Housing4 |
Existing |
2015 |
2025 |
22.9 |
1.6 |
0.6 |
.... |
.... |
|
Volunteer Brigade Equipment Upgrades14 |
Existing |
2021 |
2024 |
2.0 |
1.0 |
.... |
.... |
.... |
|
|
|
|
|
|
32.8 |
24.1 |
16.7 |
.... |
|
Premier and Cabinet |
|
|
|
|
|
|
|
|
|
Cyber Security |
Existing |
2020 |
2024 |
2.7 |
0.6 |
.... |
.... |
.... |
|
Service Tasmania Shop Capital Investment |
Existing |
|
Ongoing |
na |
0.3 |
0.3 |
0.3 |
0.3 |
|
|
|
|
|
|
0.9 |
0.3 |
0.3 |
0.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
State Growth |
|
|
|
|
|
|
|
|
|
Dial Regional Sports Complex |
Existing |
2024 |
2026 |
25.0 |
.... |
5.0 |
20.0 |
.... |
|
Macquarie Point Urban Renewal8,15 |
New |
2023 |
2029 |
375.0 |
15.0 |
30.0 |
60.0 |
125.0 |
|
Northern Suburbs (Launceston) Community Recreation Hub Project |
New |
2023 |
2025 |
27.5 |
22.5 |
5.0 |
.... |
.... |
|
Northern Suburbs Multi‑Sports Facility4 |
Existing |
2022 |
2026 |
49.7 |
22.9 |
25.7 |
0.7 |
.... |
|
Tasmanian AFL Package - High Performance Centre15 |
New |
2024 |
2026 |
60.0 |
10.0 |
40.0 |
10.0 |
.... |
|
TMAG Building Maintenance |
New |
2024 |
2026 |
2.0 |
0.5 |
1.0 |
0.5 |
.... |
|
Roads Program Expenditure11,16 |
Existing |
|
Ongoing |
na |
683.1 |
602.2 |
471.3 |
436.7 |
|
|
|
|
|
|
754.0 |
708.9 |
562.4 |
561.7 |
|
Inland Fisheries Service |
|
|
|
|
|
|
|
|
|
Inland Fisheries Infrastructure |
Existing |
2022 |
2025 |
1.0 |
0.3 |
0.3 |
.... |
.... |
|
|
|
|
|
|
0.3 |
0.3 |
.... |
.... |
|
Royal Tasmanian Botanical Gardens |
|
|
|
|
|
|
|
|
|
Royal Tasmanian Botanical Gardens upgrades |
Existing |
2024 |
2026 |
4.1 |
0.5 |
3.0 |
0.3 |
.... |
|
|
|
|
|
|
0.5 |
3.0 |
0.3 |
.... |
|
State Fire Commission |
|
|
|
|
|
|
|
|
|
Supporting our Emergency Services Volunteers - Capital Program Boost |
New |
2024 |
2025 |
10.0 |
5.0 |
5.0 |
.... |
.... |
|
|
|
|
|
|
5.0 |
5.0 |
.... |
.... |
|
TasTAFE |
|
|
|
|
|
|
|
|
|
Freer Farm Centre of Excellence17 |
Existing |
2019 |
2024 |
6.5 |
1.5 |
.... |
.... |
.... |
|
|
|
|
|
Estimated |
2023‑24 |
2024‑25 |
2025‑26 |
2026‑27 |
|
|
New/ |
|
|
Total |
|
Forward |
Forward |
Forward |
|
|
Existing |
Start |
Complete2 |
Cost |
Budget |
Estimate |
Estimate |
Estimate |
|
|
|
|
|
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
|
|
TasTAFE Facility Upgrades and Transition Fund |
Existing |
2021 |
2026 |
45.0 |
10.0 |
14.7 |
11.0 |
.... |
|
TasTAFE Priority Infrastructure Upgrades |
New |
2024 |
2025 |
3.0 |
1.0 |
2.0 |
.... |
.... |
|
Water and Energy Trades Centre of Excellence |
Existing |
2019 |
2024 |
26.0 |
10.0 |
.... |
.... |
.... |
|
|
|
|
|
|
22.5 |
16.7 |
11.0 |
.... |
|
|
|
|
|
|
|
|
|
|
|
TOTAL ALLOCATED INFRASTRUCTURE PROJECTS |
|
|
|
|
1 234.8 |
1 204.5 |
993.4 |
839.2 |
|
|
|
|
|
|
|
|
|
|
Notes:
1. This Table does not include projects undertaken by government businesses or other entities outside of the General Government Sector.
2. Completion date is estimated based on the final financial year in which funding for the project is provided. In some instances, practical completion may occur in an earlier year.
3. The Eastern Shore Multi-Sports Facility is a 2021 election commitment and was referenced in the 2021‑22 Budget to commence beyond the Forward Estimates. The 2026-27 Forward Estimate year is the first year that funding for this project is included in the Infrastructure Investment allocation.
4. Additional funding for this existing project has been provided as part of the 2023-24 Budget.
5. Due to the impact of rounding the allocation for this project appears as zero.
6. This project is funded by the Australian Government.
7. The anticipated total cost of the first phase of Digital Health Transformation is $210 million. It is anticipated more than $475 million will be allocated to this project over the next 10 years to 2032, as it is further scoped and developed by the Department.
8. The Estimated Total Cost (State contribution) for this project reflects funding allocated beyond the 2023-24 Budget and Forward Estimates.
9. This project reflects the combined cash flows associated with the Launceston General Hospital - Mental Health Precinct and Launceston General Hospital Redevelopment - Stage 2.
10. This project has been reclassified and transferred from Operating Services to Capital Services from 2023‑24.
11. This project is funded by both the State and Australian Governments.
12. This project was previously referred to as the Fisheries Integrated Licencing Management System.
13. Given the accounting treatment of funding provided for the Tasmanian Government Radio Network, it is not included in this table. The project is allocated to the Department of Police, Fire and Emergency Management with expenditure split between operating expenditure and purchases of non-financial assets, in accordance with the contractual arrangements for the delivery of the project.
14. This project will be delivered in conjunction with the State Fire Commission.
15. The Total Estimated Cost for Macquarie Point Urban Renewal and Tasmanian AFL Package - High Performance Centre projects reflect the State Government funding contributions.
16. Details of the Roads Program are provided at Table 6.4.
17. Funding was previously allocated for this project in the 2019-20 Budget and was referred to as the Agricultural Centre of Excellence.
This section provides an overview of the key projects being undertaken in 2023-24 within each of the major areas of agency infrastructure expenditure. Further details on these projects are available in individual agency chapters in Government Services Budget Paper No 2.
Chart 6.2 provides a breakdown of the 2023-24 agency infrastructure expenditure by ABS classification.

In 2023-24, total Schools, Education and Skills Infrastructure is budgeted to be $128.3 million. Major infrastructure projects include:
· New Brighton High School ($20.9 million);
· Legana Primary School ($14.7 million);
· Six New Child and Family Learning Centres ($14 million);
· TasTAFE Facility Upgrades and Transition Fund ($10 million);
· Water and Energy Trade Centres of Excellence ($10 million);
· New K-12 Sorell School ($8.5 million);
· Revitalising Cosgrove High School ($8 million);
· Montello Primary School - Major School Redevelopment ($5.8 million); and
· Lauderdale Primary School - Major School Redevelopment ($5 million).
In 2023-24, total Hospitals and Health Infrastructure is budgeted to be $161.3 million. Major infrastructure projects include:
· Royal Hobart Hospital Stage 2 Redevelopment ($30.5 million);
· Burnie and Glenorchy Ambulance Stations ($18.7 million);
· Launceston General Hospital Helipad ($15 million);
· Mersey Community Hospital Capital Upgrades ($14.3 million);
· Royal Hobart Hospital Redevelopment - Expanded Stage 2 ($13.2 million);
· Royal Hobart Hospital Pharmacy Redevelopment ($8.8 million);
· Launceston General Hospital Redevelopment - Stage 2 (including Mental Health Precinct) ($8 million);
· Regional Health and Ambulance Facilities Fund ($6.8 million); and
· Royal Hobart Hospital - New Angiography Suite and Equipment Upgrade ($5.6 million).
In 2023-24, total Law and Order Infrastructure is budgeted to be $63 million. Major infrastructure projects include:
· New Southern Remand Centre ($14.8 million);
· Burnie Court Complex ($10.1 million);
· New Northern Correctional Facility ($8.3 million); and
· Large Vessel Replacement Program ($6.5 million).
In 2023-24, total Roads and Bridges Infrastructure is budgeted to be $683.1 million. Major infrastructure projects include:
· New Bridgewater Bridge ($270.1 million);
· Infrastructure Maintenance ($108.8 million);
· Roads of Strategic Importance ($92.5 million);
· Greater Hobart Traffic Solution ($35.7 million);
· Midland Highway ($31.9 million);
· Road Safety Projects ($20.8 million); and
· State Road Upgrades - Northern Region ($15 million).
Further detail on the Roads Program is provided later in this chapter.
In 2023-24, total Information and Communication Technology Infrastructure is budgeted to be $78.6 million. Major infrastructure projects include:
· Digital Health Transformation ($40 million);
· Digital Transformation Priority Expenditure Program ($25 million); and
· Project Unify ($12.9 million).
The Digital Transformation Priority Expenditure Program will support a broad range of projects in 2023‑24 including: PARAMIS Integration; Integrated Client Information Program (previously titled Child and Youth Services System); Justice Connect; Whole of Government Online Portal; Justice Connect - CRIMES Replica Interface Replacement; Registration to Work with Vulnerable People Engagement; PlanBuild Tasmania; Modernising Tasmania’s Water Information System (Phase 1); PWS Statewide booking system; Fisheries Digital Transition Project (Stage 2); Emergency Dispatch Messaging and Alerting Project; LiveScan and PhotoTrac Replacement; PINS - System and Business Uplift Project; Cyber Hubs; and Skills Tasmania Data System.
In 2023-24, total Tourism, Recreation and Culture Infrastructure is budgeted to be $108.4 million. Major infrastructure projects include:
· Northern Suburbs Multi-Sports Facility ($22.9 million);
· Northern Suburbs (Launceston) Community Recreation Hub Project ($22.5 million);
· Macquarie Point Urban Renewal ($15 million);
· Cradle Mountain Experience ($12.2 million); and
· Tasmanian AFL Package - High Performance Centre ($10 million).
In 2023-24, total Other Infrastructure is budgeted to be $12 million. Major infrastructure projects include:
· Supporting our Emergency Services Volunteers - Capital Program Boost ($5 million);
· Modernise our Research Farms ($2 million); and
· Expansion of the House of Assembly to 35 Members - Office Accommodation ($1.7 million).
The Roads Program comprises new works projects and the upgrade and maintenance of established roads. In 2023-24, total roads program expenditure is $683.1 million. This includes a State Government allocation of $305.9 million and an Australian Government allocation of $377.3 million.
|
Start |
Complete1 |
Estimated Total Cost |
2023‑24 |
2024-25 |
2025-26 |
2026-27 |
|
|
$m |
$m |
$m |
$m |
$m |
|||
|
STATE FUNDED |
|||||||
|
Co-contribution Projects2 |
|||||||
|
Algona Interchange and Kingston Bypass3 |
2022 |
2027 |
60.0 |
3.7 |
4.0 |
3.5 |
.... |
|
Channel Highway Bypass of Huonville4 |
2023 |
2026 |
21.7 |
2.0 |
2.2 |
2.3 |
2.0 |
|
Domain Highway Planning |
2015 |
2023 |
5.0 |
0.1 |
.... |
.... |
.... |
|
East and West Tamar Highway Upgrades5,6 |
2023 |
2030 |
84.0 |
4.1 |
4.0 |
2.0 |
10.0 |
|
Great Eastern Drive5,7 |
2018 |
2030 |
131.3 |
2.0 |
3.0 |
4.0 |
5.0 |
|
Greater Hobart Traffic Solution8,9 |
2019 |
2026 |
217.8 |
30.5 |
21.8 |
26.6 |
9.9 |
|
Heavy Vehicle Safety and Productivity10 |
2023 |
2024 |
3.5 |
3.5 |
.... |
.... |
.... |
|
Infrastructure Maintenance11 |
Ongoing |
na |
86.0 |
85.5 |
86.1 |
83.0 |
|
|
Infrastructure Stimulus Funding |
2020 |
2024 |
86.8 |
2.9 |
.... |
.... |
.... |
|
New Bridgewater Bridge5,12 |
2019 |
2026 |
786.0 |
56.1 |
35.9 |
0.9 |
3.0 |
|
Road Safety Projects |
|
Ongoing |
Na |
14.4 |
14.2 |
13.4 |
7.1 |
|
Roads of Strategic Importance5,13 |
2019 |
2030 |
1 282.3 |
20.4 |
13.5 |
5.2 |
2.9 |
|
Rokeby Stage 3 - Pass Road to Oakdowns5,14 |
2022 |
2027 |
55.0 |
2.4 |
2.8 |
2.3 |
2.0 |
|
Sideling Upgrades Stage 25 |
2025 |
2030 |
70.0 |
1.6 |
2.0 |
4.0 |
3.0 |
|
South East Traffic Solution9,15 |
2019 |
2026 |
66.0 |
4.3 |
4.0 |
6.8 |
10.0 |
|
State Road Upgrades - Northern Region16 |
2019 |
2025 |
54.2 |
15.0 |
10.6 |
1.4 |
.... |
|
State Road Upgrades - North West and West Coast Region17 |
2019 |
2026 |
50.1 |
6.0 |
3.0 |
3.0 |
1.0 |
|
State Road Upgrades - Southern Region5,18 |
2018 |
2029 |
129.8 |
3.6 |
2.8 |
.... |
.... |
|
Urban Congestion Fund5,9,19 |
2019 |
2028 |
99.7 |
3.0 |
7.0 |
11.4 |
0.7 |
|
261.6 |
216.5 |
172.8 |
139.7 |
|
Start |
Complete1 |
Estimated Total Cost |
2023‑24 Budget |
2024-25 |
2025-26 |
2026-27 |
|
|
$m |
$m |
$m |
$m |
$m |
|||
|
Other Road Infrastructure |
|||||||
|
Arthur Highway Upgrades5 |
2022 |
2029 |
50.0 |
0.2 |
1.5 |
4.5 |
12.5 |
|
Bus Stop Upgrades |
2022 |
2027 |
10.0 |
2.5 |
2.5 |
2.5 |
1.8 |
|
Cycling Infrastructure5 |
2023 |
2028 |
6.0 |
3.8 |
1.0 |
1.0 |
1.5 |
|
Cygnet Township Safety Upgrade |
2024 |
2025 |
5.0 |
2.4 |
.... |
2.3 |
.... |
|
Devonport to Cradle Mountain Road Upgrades5 |
2025 |
2029 |
25.0 |
0.3 |
0.5 |
2.5 |
7.0 |
|
Extending the Great Eastern Drive - Binalong Bay Road |
2019 |
2024 |
4.5 |
1.0 |
0.2 |
.... |
.... |
|
Glenora Road Upgrades |
2022 |
2027 |
1.0 |
0.3 |
0.3 |
0.3 |
0.3 |
|
Huntingfield Roundabout Improvements |
2023 |
2025 |
5.5 |
4.5 |
1.0 |
.... |
.... |
|
Launceston and Tamar Valley Traffic Vision5 |
2019 |
2028 |
75.1 |
0.5 |
1.0 |
5.0 |
19.6 |
|
Network Planning20 |
|
Ongoing |
na |
3.6 |
1.1 |
1.1 |
1.1 |
|
New Park and Ride Facilities |
2023 |
2027 |
20.0 |
5.0 |
7.0 |
7.0 |
0.3 |
|
Program Management |
|
Ongoing |
na |
8.4 |
8.6 |
8.8 |
9.1 |
|
Roads Package to Support Tasmania’s Visitor Economy |
2019 |
2024 |
66.1 |
2.1 |
0.5 |
.... |
.... |
|
Stanley Highway Tourism Upgrades5 |
2025 |
2028 |
10.0 |
0.5 |
0.5 |
1.0 |
5.0 |
|
Targeting Congestion Package |
2023 |
2027 |
20.8 |
5.6 |
6.3 |
6.0 |
2.9 |
|
Traffic Management and Engineering Services |
|
Ongoing |
na |
3.7 |
3.7 |
3.8 |
3.9 |
|
44.3 |
35.6 |
45.7 |
65.1 |
||||
|
|
|
|
|
|
|
|
|
|
TOTAL STATE FUNDED ROADS |
|
|
|
305.9 |
252.1 |
218.5 |
204.7 |
|
|
|
|
|
|
|
|
|
1. Completion date is estimated primarily based on the final financial year in which funding for the project is provided. In some instances, works may be completed in an earlier year.
2. These projects are funded by both the State and Australian Governments.
3. This project will improve the efficiency of this road corridor in an area of growth in Southern Tasmania.
4. This project includes the Australian Government’s contribution of $13.2 million for Huon Link Road to improve safety and efficiency in Huonville.
5. The Estimated Total Cost for this project reflects funding beyond the 2023-24 Budget and Forward Estimates.
6. This project includes the State Government’s contribution of $84 million for the Northern Roads Package Stage 2.
7. This project includes the Australian Government’s contribution of $100 million and the State Government’s contribution of $31.3 million to support tourism.
8. This project includes the State and Australian Government’s co-contribution of $65 million for the Tasman Bridge Upgrade.
9. Since the publication of the 2022‑23 Budget, funding has been reallocated across the Greater Hobart Traffic Solution, South‑East Traffic Solution and Urban Congestion Fund projects to align with program delivery which has adjusted Estimated Total Costs.
10. This project includes additional State Government contribution of $3.5 million in 2023-24 to deliver the Heavy Vehicle Rest Areas on key roads.
11. This project includes the State and Australian Government’s contribution for the Freight Capacity Upgrade. It also includes the State Government commitment for Crumbed Rubber Roads transferred from the Department of Natural Resources and Environment Tasmania.
12. The New Bridgewater Bridge has a target of traffic on the bridge by the end of 2024, with construction to be completed in 2025. Following construction, the existing Bridgewater Bridge will be decommissioned.
13. This project includes the Australian Government’s contribution of $336 million for the Northern Roads Package Stage 2. It also includes the Australian Government contribution of $150 million for the Hobart to Sorell Corridor - Midway Point and Sorell Causeways, as well as funding for the Hobart Airport Interchange and $80 million for the Bass Highway.
14. This project includes the State and Australian Government’s co-contribution of $55 million for important efficiency and safety upgrades on the South Arm Highway.
15. This project includes the State Government’s contribution of $37 million to the Hobart to Sorell Corridor - Midway Point and Sorell.
16. This project includes the State Government’s contribution to the Midland Highway.
17. This project includes the State Government’s funding contribution for the Roads of Strategic Importance, Bass Highway - Marrawah to Wynyard Upgrade.
18. This project includes the Australian Government’s contribution to the Mornington Roundabout.
19. This project includes the State and Australian Government’s co-contribution of $13.5 million for the Northern Transit Corridor. It also includes the State and Australian Government’s co-contribution of $11.5 million for Intelligent Transport Solutions.
20. This item includes additional State Government contribution of $1.3 million in 2023-24 to deliver Corridor Studies.
21. This project includes additional Australian Government funding of $30 million for the Mornington Roundabout Upgrade.
Purchases of Non‑Financial Assets is an accounting classification under the Australian Accounting Standards. It appears on the Income Statement and Cash Flow Statement and reflects purchases of non‑financial assets such as land, buildings, plant and equipment, infrastructure and intangible assets. While the majority of the Purchases of Non‑Financial Assets is comprised of Infrastructure Investment projects, there is a portion of Purchases of Non‑Financial Assets expenditure that is not included in this chapter. Such items include Budget allocations for:
· the Government’s fleet management services;
· ambulance, surgical and medical equipment;
· computer software; and
· other smaller capital items.
Conversely, Infrastructure Investment projects can include allocations of expenditure that are not classified as Purchases of Non‑Financial Assets under the Australian Accounting Standards, but are directly related to infrastructure projects. This expenditure can include items such as employee entitlements, infrastructure maintenance, grant payments and other supplies and consumables.
Table 6.5 provides a reconciliation between the two measures.
|
|
2022-23 |
2022-23 |
2023-24 |
2024-25 |
2025-26 |
2026-27 |
|
|
|
Estimated |
|
Forward |
Forward |
Forward |
|
|
Budget |
Outcome |
Budget |
Estimate |
Estimate |
Estimate |
|
|
$m |
$m |
$m |
$m |
$m |
$m |
|
|
|
|
|
|
|
|
|
Purchases of non-financial assets1 |
1 166.4 |
868.4 |
1 219.3 |
1 161.5 |
987.9 |
826.3 |
|
Less Purchases of non-financial assets excluded from Infrastructure Investment |
80.9 |
71.7 |
113.1 |
89.8 |
96.8 |
90.4 |
|
Plus Infrastructure Investment not included in Purchases of non-financial assets |
238.8 |
171.8 |
128.6 |
132.9 |
102.2 |
103.2 |
|
|
|
|
|
|
|
|
|
Equals TOTAL INFRASTRUCTURE EXPENDITURE |
1 324.2 |
968.5 |
1 234.8 |
1 204.5 |
993.4 |
839.2 |
|
|
|
|
|
|
|
|
Note:
1. Reflects Purchases of Non-Financial Assets as detailed in the General Government Sector Cash Flow Statement.